Production planning with a Gantt chart

Our MES system includes production planning features. It lets you create plans for individual orders, which are then clearly displayed in a Gantt chart. You will also find tools for planning equipment availability, including the layout of individual shifts. The shift calendar is generated automatically and is ready several years ahead.

Order planning

Order planning is a key feature for managing production. It lets you create a clear, easily adjustable plan in the form of a Gantt chart. Once you enter the basic order parameters, such as the target quantity and theoretical cycle time, the system automatically closes the order when a downtime (e.g. setup) is reported and moves smoothly on to the next one in line. This gives you detailed statistics for every order, such as the number of parts produced, downtime, scrap rate, availability, efficiency and OEE. Adjusting the plan is very intuitive. With drag and drop, you can easily change the order of jobs in the queue or move them between lines or machines.

Availability planning

In the availability planning module, you simply set up the individual shifts. Shifts are planned for specific equipment and machines, so if you only produce on the morning and afternoon shifts, for example, you set them up accordingly. If certain machines do not run at all on some days, you can easily plan these shutdowns too. Thanks to shift copying, creating a monthly plan takes just a few minutes, even for dozens of machines.

Shift patterns

An automatic shift roster, generated several years ahead, comes as standard. Just enter the basic shift rotation rules and the system creates the shift calendar for you. Shift planning requires no manual entry and saves a lot of time.

© 2026, NOXEM s.r.o.